![5. DJI_0338](http://handbud.com.pl/wp-content/uploads/2021/08/5.-DJI_0338-scaled.jpg)
![4. DJI_0335](http://handbud.com.pl/wp-content/uploads/2021/08/4.-DJI_0335-scaled.jpg)
![3. DJI_0342](http://handbud.com.pl/wp-content/uploads/2021/08/3.-DJI_0342-scaled.jpg)
![2. DJI_0345](http://handbud.com.pl/wp-content/uploads/2021/08/2.-DJI_0345-scaled.jpg)
![1. DJI_0328](http://handbud.com.pl/wp-content/uploads/2021/08/1.-DJI_0328-scaled.jpg)
![6. połączone](http://handbud.com.pl/wp-content/uploads/2021/08/6.-polaczone-scaled.jpg)
![5. DJI_0338](http://handbud.com.pl/wp-content/uploads/2021/08/5.-DJI_0338-300x200.jpg)
![4. DJI_0335](http://handbud.com.pl/wp-content/uploads/2021/08/4.-DJI_0335-300x200.jpg)
![3. DJI_0342](http://handbud.com.pl/wp-content/uploads/2021/08/3.-DJI_0342-300x200.jpg)
![2. DJI_0345](http://handbud.com.pl/wp-content/uploads/2021/08/2.-DJI_0345-300x200.jpg)
![1. DJI_0328](http://handbud.com.pl/wp-content/uploads/2021/08/1.-DJI_0328-300x200.jpg)
![6. połączone](http://handbud.com.pl/wp-content/uploads/2021/08/6.-polaczone-300x130.jpg)
Scope of works:
– Foundation works,
– Steel structure assembly Works,
– Installation of external walls made of sandwich panels,
– Implementation of an industrial floor,
– Road works, squares and parking lots,
– Installation works, i.e. electrical, water and sewage, gas, central heating installations,
– Installation works: ventilation,
– Rainwater sewage system,
– Construction of a tank for fire fighting purposes.
Commencement of works: April 2017
Completion of works: April 2018
Object volume: 78 919 m3
Usable floor area: 6 764,23 m2
Investor: Trans Serwis Sp. z o.o.
General contractor: PBU HAND-BUD Sp. z o.o.